


Battery capacity shown is for the standard variant. Other variants of this model may differ.
Estimated time to charge from 20% to 100% with the Evnex E2 (7.4 kW).
Based on grid-only charging at an average tariff of $0.19/kWh. Got solar? Your cost per charge drops even further.

Battery capacity shown is for the standard variant. Other variants of this model may differ.
Estimated time to charge from 20% to 100% with the Evnex E2 (7.4 kW).
Based on grid-only charging at an average tariff of $0.19/kWh. Got solar? Your cost per charge drops even further.
Estimated time to charge from 20% to 100% with the Evnex X22 (22 kW). Charge speed is limited by your vehicle's onboard charger.

Battery capacity shown is for the standard variant. Other variants of this model may differ.
Estimated time to charge from 20% to 100% with the Evnex E2 (7.4 kW).
Based on grid-only charging at an average tariff of $0.19/kWh. Got solar? Your cost per charge drops even further.
Estimated time to charge from 20% to 100% with the Evnex X22 (22 kW). Charge speed is limited by your vehicle's onboard charger.

Battery capacity shown is for the standard variant. Other variants of this model may differ.
Estimated time to charge from 20% to 100% with the Evnex E2 (7.4 kW).
Based on grid-only charging at an average tariff of $0.19/kWh. Got solar? Your cost per charge drops even further.
Estimated time to charge from 20% to 100% with the Evnex X22 (22 kW). Charge speed is limited by your vehicle's onboard charger.

Battery capacity shown is for the standard variant. Other variants of this model may differ.
Estimated time to charge from 20% to 100% with the Evnex E2 (7.4 kW).
Based on grid-only charging at an average tariff of $0.19/kWh. Got solar? Your cost per charge drops even further.
Estimated time to charge from 20% to 100% with the Evnex X22 (22 kW). Charge speed is limited by your vehicle's onboard charger.

Battery capacity shown is for the standard variant. Other variants of this model may differ.
Estimated time to charge from 20% to 100% with the Evnex E2 (7.4 kW).
Based on grid-only charging at an average tariff of $0.19/kWh. Got solar? Your cost per charge drops even further.
Estimated time to charge from 20% to 100% with the Evnex X22 (22 kW). Charge speed is limited by your vehicle's onboard charger.

Battery capacity shown is for the standard variant. Other variants of this model may differ.
Estimated time to charge from 20% to 100% with the Evnex E2 (7.4 kW).
Based on grid-only charging at an average tariff of $0.19/kWh. Got solar? Your cost per charge drops even further.
Estimated time to charge from 20% to 100% with the Evnex X22 (22 kW). Charge speed is limited by your vehicle's onboard charger.

Battery capacity shown is for the standard variant. Other variants of this model may differ.
Estimated time to charge from 20% to 100% with the Evnex E2 (7.4 kW).
Based on grid-only charging at an average tariff of $0.19/kWh. Got solar? Your cost per charge drops even further.
Estimated time to charge from 20% to 100% with the Evnex X22 (22 kW). Charge speed is limited by your vehicle's onboard charger.





Charge automatically during off-peak windows so no cheap kilowatt goes to waste.
Got solar panels? Evnex will automatically send excess solar straight to your Zeekr.
No solar yet? No worries. Evnex chargers are designed to seamlessly optimise your grid energy use.
Additional home safety measures built in, so you can rest easy knowing your home, appliances and Zeekr are safe.





Tested to operate in -22°C to 55°C, our EV chargers are designed to handle whatever you throw at them.
Over-the-air updates means your EV charger investment is always getting better with every new feature we release.
Track and manage every kWh, every dollar, and every charge all from your phone.
Longer than most because we stand by our New Zealand engineering.


Yes. Every Zeekr sold in New Zealand charges on AC through a Type 2 connector, the same standard every Evnex charger is built around. Plug in and the car and charger sort the rest out between themselves.
On single-phase power, an E2 adds up to 50 km of range per hour, about four times faster than a wall plug. On three-phase power, the X22 adds up to 120 km per hour, and Zeekr's onboard chargers are quick enough to make real use of it.
If your home has three-phase power, the X22 makes the most of the 11 kW and 22 kW onboard charging across the Zeekr range. On single-phase, any E2 will comfortably charge your Zeekr overnight. If you're not sure what your switchboard has, our quote process will sort that out.
No. The 800-volt system is about DC fast charging on road trips. At home, your Zeekr charges on AC through its onboard charger, and every Evnex charger works with it. Most of your charging will happen at home, where the power is cheapest.
Both are smart chargers that charge your Zeekr at the same speed. The difference is solar: the E2 Flex can have solar diversion added later, while the E2 Core keeps things simple for homes that won't need it. Both carry the same 4-year warranty.
Our solar-capable chargers divert excess solar straight to your car, and the E2 Flex can have solar added when you're ready. If you don't have panels yet, every Evnex charger still schedules charging for cheap off-peak windows, so you save from day one.
Yes. Tell us about your Zeekr and your home, and we'll send an itemised, fully-installed quote so you can see exactly what you're paying for. A registered Evnex installer in your region completes the job, typically in a couple of hours.
It's a built-in safety feature that watches your home's total electricity use and eases charging back if the house gets close to its limit. Your oven, heat pump and Zeekr can all draw power at once without troubling the switchboard.
Four years, which is longer than most. We design and build our chargers in Christchurch, and we stand by our New Zealand engineering. The warranty is the same whether you buy the charger on its own or fully installed.